Project Overview

Qatar Petroleum Dukhan Water Injection Wireless SCADA Project
The Dukhan field is located onshore Qatar and is some 70 km long and 10 km wide. The field contains some 600 oil and gas production wells and 190 water injection wells.
The project objective was to install a wireless SCADA system to monitor the pressure and flow into the 190 Water Injection wells to facilitate real-time remote ...

BP Southern North Sea Offshore Well Monitoring Project
To date three offshore platforms located in BP's southern North Sea (SNS) asset have been instrumented by Zencus.
The primary objective was to monitor Well Integrity; typically Annulus A, B & C pressures and wellhead temperature and deliver the data to the Well Engineer's desktop in real time. A practical constraint was the cost and logistical problems in laying cables from the platform control rooms to the instruments located in the well cellar deck.

ADCO Asab Field Pilot Project
The Pilot trial implementation commenced in early 2006 and ran through to a successful conclusion in mid-2008 in three phases.
The original scope included wireless instrumentation of six flowing and gas-lifted oil wells in the Asab field, Abu Dhabi.

Saudi Aramco Berri Field Remote Monitoring & Control via VSAT
The project objective was to:
Transmit real-time data from two unmanned offshore platforms to the onshore seperation plant using VSAT communication




